Best Management Practices

Travis County requires the owner of post-construction infrastructure, also referred to as post-construction best management practices (BMPs), to obtain a permit requiring maintenance and proper operation of the BMPs. Typically, a post-construction BMP is a sediment pond or sand filter on a common area lot. The owner responsible for obtaining the Travis County permit is typically the development’s property owner, a municipal authority such as a the water district, or a homeowner’s association.

man by pond med

Instructions, guidance, and forms for obtaining the required permit are in the following links.

TAX RATE: TRAVIS COUNTY ADOPTED A TAX RATE THAT WILL RAISE MORE TAXES FOR MAINTENANCE AND OPERATIONS THAN LAST YEAR’S TAX RATE. THE TAX RATE WILL EFFECTIVELY BE RAISED BY 12.7 PERCENT AND WILL RAISE TAXES FOR MAINTENANCE AND OPERATIONS ON A $100,000 HOME BY APPROXIMATELY $34.51.